Build-Over Report 

RW Underground Services report templates are accepted by Water Authorities as site plans are clear and concise, the CCTV is coded to WRc standards. To support this, our team are very familiar with the regulations and requirements of a CCTV investigation and what the Water Authority are looking for.

 

Our template include contents such as:

 

1) Site plan (showing drainage layout, building outline and hard standing surfaces and dimensions of proposed build footprints and drain lines)

​

2) CCTV coding page (coded and condition graded from WRc Drain Repair Book 3)

​

3) CCTV Defect photograph page (showing snap shot images of each line defects)

​

4) Photographs page

​

5) Drain overview and recommendations page (survey summary of each line including repair recommendations)

​

6) Quotation Page (If applicable)

​

We would generate the report when you send over the site plans and photographs along with the CCTV footage. We code each line in guidance with WRc Drain Repair Book and condition grade each line (A, B or C) to report the drain serviceability. 

​

We charge our customers per report and so whether you want to use our services for all of your CCTV survey's, for cover during busy periods, or a one off report, we can help. Our Report turnaround is 48 hours from RW Underground Services receiving the paperwork.

​

​